Things You'll Need
Instructions
Laying and Ballasting
Mark the desired position of your rail lines on your layout with a pencil, temporarily tacking down the track to hold the pieces in place.
Remove the track and cover the track line with strips of cork or synthetic road bed, securing with a few rail nails and white glue. Trim the road bed as necessary with household scissors.
Position the track in place, trimming the rails and ties with rail nips or a razor saw as necessary.
Tack down the rails after test fitting all parts and apply a small amount of white glue to the bottom of a few ties to hold it in place and allow to set.
Pour a few ounces of rail ballast into a small cup.
Transfer a few teaspoons of the rail ballast to the funnel and slowly tap the sides, allowing the ballast to fill the gaps between the rail ties both inside and outside the rails.
Brush and shape the ballast with a small, flat-headed brush until the ballast lies even with the ties and the edges are smooth and shaped into a gentle angle.
Mix a solution of 1 part white glue, 1 part isopropyl alcohol and 4 parts water to use as a securing solution for the ballast. (See Reference 1)
Draw a few drops of your glue solution into a pipette or drinking straw and drop a few drops of the solution at a time on the ballast, allowing it to soak in. (See Reference 1)
Repeat this process for each track and let the ballast cure for 24 hours before running trains on the track.
Wipe down the rails with isopropyl alcohol to clean the rails when the process is complete.