Things You'll Need
Instructions
Select a straight track section where you wish to install the Lighted Lock-On.
Slide either outer rail into the metal lip of the Lock-On. It is located closest to the wiring thumbscrews.
Press the lower edge of the center rail inside the metal clip near the end of the lock-on. The track section is now firmly secured.
Remove 1/2 inch of insulation from each end of the two strands of bell wire with the utility knife.
Turn off or unplug the train transformer from the power outlet.
Connect the stripped end of one wire to the Power/A (accessory) terminal on the train transformer, and connect one end of the second wire to the common grounding terminal on the transformer .
Loosen the two thumbscrews on the Lock-On.
Wrap the opposite end of the wire attached to the Power/A accessory terminal around the post labeled "1" on the Lock-On. Tighten down the thumbscrew ensuring good bare wire contact with the threaded post and a tight connection.
Wrap the opposite end of the wire attached to the common grounding terminal around the post marked "2" on the Lock-On. Then tighten down the thumbscrew ensuring good bare wire contact with the threaded post and a secure connection.
Power up the transformer. The green indicator light on the Lock-On will glow, signaling that you have made solid wiring connections and that power is flowing throughout your layout.